Bottle Rocket

Featured Project

Bottle Rocket

Located in Addison, this 42,000sf project consisted of a two floor finish-out including full demolition and build back in 12 weeks. The project included new public areas, full data room, two restroom renovations, versatile meeting rooms, and a full service break room.

  • Location: Addison, TX
  • Client representative: CBRE
  • Designed by: Gensler
  • Project size: 42,000sf
  • Project cost: $1,800,00
  • 12 week¬†project duration

Cyxtera is a secure infrastructure company that integrates security into core service offerings of enterprise IT and the cloud. K2 Construction partnered with Gensler on this high-end office for a repeat client in Addison One Circle. Unique angles are a consistent theme throughout the space starting with the wall connections, of which very few are a perfect 90 degrees. Additionally, the specific angles of the aluminum fin feature wall create a code representing the Cyxtera mission statement.

In partnership with JLL and IA Interior Architects, K2 was selected to complete this full floor renovation of 24,000 SF of office space for HighGround Advisors, an investment and trust services company specializing in serving the nonprofit sector. The space is located within the fully operational Comerica Bank Tower, a 60-story, five-star property. The project scope included multiple executive offices, executive lounges, reception area, breakroom, boardroom, and open office space.